Delivery Matrix
Instead of a linear checklist only, each project stage is managed through a matrix of scope, quality, and dependency controls. This format makes the page structure and project logic visibly different from the About page.
- Scope lane: confirms what is being built or renovated in each stage.
- Control lane: verifies measurable quality points before progression.
- Dependency lane: prevents overlap conflicts between trades and deliveries.